BUILDING “SYNEVYR”(#23) RESIDENTIAL COMPLEX “PATRIOTYKA”, DARNYTSKIY DISTRICT       Kyiv, between B. Gmyri street and Kollektorna street  Choose the house

Number of section and floors:

2 sections; 25-storey building


Walls:
  • exterior – prefabricated ferroconcrete blocks 160mm thick with the insulation system on the external ventilated facades, on loggias and balconies  - insulation system, plaster and paint works are made.
  • interior – prefabricated ferroconcrete blocks 160 mm and 80 mm thick.
  • Partition walls – artificial plaster panels 80 mm thick
  • Between sections – prefabricated 3-layer panels 300 mm thick
Overlapping:
Prefabricated ferroconcrete panels 160 mm thick
Loft (attic):
cold
Roofing:

Roll coating.

Characteristics of fire prevention measures:
  • Lighting of stairs - natural, at night time –  electric;
  • Antismoke protection – according to the project;
  • Installed fire extinction pipes on every floor and in bathrooms in the apartments(FEP)
  • Fire extinction automatic system
Number of elevators:

3 on each section, which are:

  • 2 elevators with capacity for 400 kg;
  • 1 elevator with 1000 kg capacity (also for firemen transportation).
Floor height:

2,80m ( floor to floor).

Additional interior works:
  • Main entrance to the apartment –  metal,shockproof;
  • Interior doors in the apartment – wooden frame MDF lined;
  • Windows and balcony doors – plastic with double glazing.
  • Glazing of loggias and balconies – 1 layer metal plastic glazing.
Interior finishing works in the apartments:

Rooms, living rooms , halls and hallways:

  • floor – oilcloth;
  • walls –  wallpaper;
  • ceiling –  paste whitewash.

Kitchen:

  • floor - oilcloth;
  • walls – washable wallpaper;
  • ceiling – paste whitewash.

Bathrooms (bathroom, toilet):

  • floor – hydro isolation and ceramic tiling;
  • walls and ceiling – finishing interior works not made.
Bathroom equipment :

1-room apartments  - 1 steel bath,  1 wash basin, 1 toilet;

2-room apartments  - 1 steel bath, 2 wash basins, 1 toilet;

3-room apartments – 1 steel bath, 2 wash basins, 2 toilets:

  • wash sinks in the kitchen are not installed;
  • stop bathroom armature and ball valves are installed
Towel dryers:

Electric, not installed. In the bathrooms and joined bathrooms an electric socket for the dryer is installed.

Type of oven:
Electric, not installed.
Wiring:
Made of copper wire with installation o sockets and switches
Telephone cable, TV:
Hose (connection) performed to the boards on each floor. Connection with the apartment and the interior layout not made.
Heating system:

 Two- piped dual-zoned wiring, for every apartment, with low hose connection:

  • first zone – 1 – 11 floors,
  • second zone – 12 – 25 floors.
The hose of heating system made to every apartment of polyethylene  pipes in the floor construction.
Type of heating device:
steel radiators
Ventilation system:

Mandatory in the kitchen and in bathrooms wall ventilators are installed.The installation of the outer block of the air conditioner is planned. The air conditioner is not installed.

Cold water supply:

2-zoned.

  •  First zone – 1- 12 floors inclusive (water supply in ascendant way).
  •  Second zone –  25—13 floors inclusive (water supply in descendant way).
Supply pipelines are located under the ceiling of the common hall on the 25th floor..
Hot water supply:

2-zoned:

  •     First zone –  12- 1 floors inclusive (water supply in descendant way ).

Supply pipelines are located under the ceiling of the common hall on the12th floor.

  •     Second zone –  25-13-floors inclusive  (water supply in descendant way).

Supply pipelines are located under the ceiling of the common hall on the   25th floor.

Circulation pipelines of the second zone are located under the ceiling of the common hall on the 12th floor.

Each apartment dilution of hot and cold water from pipeslines, placed in cabinets corridors of common hall, connection to places of bathroom equipment performed with polyethylene pipes in floor construction apartments.

Counters in each apartment:
  • electricity –  each apartment;
  • cold and hot water – each apartment;
  • heating – located on the common hall blocks for every apartment.
Finishing works on the common halls:

Elevator hall, corridors and stairs:

  • stairs floor –  concrete finish;
  • corridor and elevator hall floor –  ceramic tiling;
  • elevator hall walls on the 1st floor –  ceramic tiling;
  • corridor and elevator hall walls at the common floors – water resistant paint;
  • ceiling – paste whitewash;
  • entering doors to the building – aluminum glazed;
  • interior doors –wooden;
  • windows –  wooden and metal glazing.
Embellishment:
  • exterior lighting – according to the project;
  • roads, pavements, pedestrian paths – asphalt coating and FEM coating;
  • recreation areas: active rest, playground, temporary parking for vehicles.
Attention to the investors!
  1. It is forbidden to dismantle independently the constructive elements of the object, interior and exterior works and change the engineering communications.
  2. During the construction process the developer has the right to add/ change elements in the design and technological solutions of the residential building that do not degrade its consumer qualities and do not lead to violation of sanitary norms.
  3. The total plot of the apartment is approximate; final calculations should be made according to the official data of technical inventory.