BUILDING “LVIVSKIY”(#26) RESIDENTIAL COMPLEX “PATRIOTYKA”, DARNYTSKIY DISTRICT       Kyiv, between B. Gmyri street and Kollektorna street  Choose the house

Number of sections and floors:

2 sections; 25-storey building

  •     1-floor – apartments and non-residential space;
  •     2-25 floors – apartments.
Walls:

Exterior walls:

Prefabricated ferroconcrete: 160 mm width with exterior insulation system on external ventilated facades,painted and plastered at the loggias and balconies;

  • Interior walls - prefabricated ferroconcrete blocks 160 mm width
  • Partition walls - prefabricated ceramsite concrete blocks 92mm width. Sound isolation between the non-residential areas and apartments is installed.
Overlapping:
Prefabricated ferroconcrete blocks 160 mm width. Width of floor structures - 50 mm.
Loft (attic):
cold.
Roof:
Roll coating.
Characteristics of fire prevention measures:
  • Lighting of stairs - daylight, at night time –  electric;
  • Antismoke protection – according to the project;
  • Installed fire extinction pipes on every floor and in bathrooms in the apartments (FEP)
  • Fire extinction automatic system
Number of elevators:

3 on each section, which are:

  • 2 elevators with 400 kg capacity;
  • 1 elevator with 1000 kg capacity (also for firemen transportation).
Floor height:
2,80m ( floor to floor).
Additional interior works:
  • Entrance door to the apartment –  metal,shockproof;
  • Interior doors in the apartment – wooden frame MDF lined;
  • Windows and balcony doors – plastic with double glazing.
Interior finishing works in the apartments:

Rooms, living rooms , halls and hallways:

  • floor – oilcloth;
  • walls –  wallpaper;
  • ceiling –  paste whitewash.

Kitchen:

  • floor - oilcloth;
  • walls – washable wallpaper;
  • ceiling – paste whitewash.

Bathrooms (joined bathroom, lavatory,toilet):

  • floor – hydro isolation and ceramic tiling;
  • walls and ceiling – finishing interior works not made.
Bathroom equipment :

1-room apartments  - 1 steel bath,  1 wash basin, 1 toilet;

2-room apartments  - 1 steel bath, 2 wash basins, 1 toilet;

  • wash sinks in the kitchen are not installed;
  • stop bathroom armature and ball valves are installed
Towel dryers:
Electric, not installed. In the bathrooms and joined bathrooms an electric socket for the dryer is installed.
Type of oven:
Electric, not installed
Wiring:
Made of copper wire with installation of sockets and switches.
Telephone cable, TV:
Wires (connection) performed to the boards on each floor. Connection with the apartment and the interior layout not made.
Heating system:

 Two- piped dual-zoned wiring, with low hose connection:

  • first zone – 1 – 12 floors, low wiring system,
  • second zone – 13 – 25 floors, upper wiring system.
The wires of heating system made to every apartment of polyethylene pipes in the floor structures.
Type of heating device:
steel radiators
Ventilation system:
Mandatory, in the kitchen and in bathrooms wall ventilators are installed.
Cold water supply:

Two-zoned.

First zone – 1 – 12 floors, with lower dilution of supply pipelines to the apartment risers located in each floor corridors of common use finishing at the 12th floor;
second zone – 25 – 13 floors, with upper dilution of supply pipelines to the apartment risers located on each floor corridors of common use finishing at the 13th floor.
Hot water supply:

Dual- zoned :

  • Firstzone – 12 – 1 floors with upper dilution of pipelines to the apartment risers located on the corridor of common use on each floor and banding in the basement;
  • secondzone – 25 – 13 floors with upper dilution of pipelines to the apartment risers located on the corridor of common use in each floor and banding at the ceiling of the common hall on the 12th floor.
The hose of systems of hot and cold water from the risers located on the common blocks is made of polyethylene pipes in the floor structures.
Installment and settlement of the Counters:
  • electricity –  each apartment;
  • cold and hot water – each apartment;
  • heating – located on the corridors of common use for every apartment.
Finishing works in the common halls:

Elevator hall, corridors of common use and stairs:

  • stairs floor –  concrete finish;
  • corridor of common use and elevator hall floor –  ceramic tiling;
  • elevator hall walls on the 1st floor –  ceramic tiling;
  • corridor of common use  and elevator hall walls at the typical floors – water resistant paint;
  • ceiling – paste whitewash;
  • entrance  doors to the building – aluminum glazed;
  • interior doors –wooden;
  • windows –  wooden and metal glazing.
Embellishment:
  • exterior lighting – according to the project;
  • roads, pavements, pedestrian paths – asphalt coating and FEM coating;
  • recreation areas: active rest, playground, temporary parking for vehicles.
Attention to the investors!
  1. It is forbidden to dismantle independently the constructive elements of the object, interior and exterior works and change the engineering communications.
  2. During the construction process the developer has the right to add/ change elements in the design and technological solutions of the residential building that do not degrade its consumer qualities and do not lead to violation of sanitary norms.
  1. The total area of the apartment is approximate; final calculations should be made according to the official data of technical inventory.